We have the experience and capacity to form and finish structures as a part of the construction elements such as microtunneling jacking stations and caissons for sewers or for external works such as the potable water storage tanks at Araluen Country Club Estate and the concrete batching plant for Quarry Industries in East Perth.
A pre-casting operation is carried out at our Maddington depot for items such as plastic lined sewer manholes, stormwater drainage base units or any structures which can be transported to remote contracts through the state. Alternatively, formwork is constructed in the workshop and transported to site as a unit or in part, with detailed construction plans for on-site construction crews to follow. |
 |
|